top of page

Keller Street Bridge Closed

FYI RESIDENTS We have been notified by DOTD that they inspected the Keller Street Bridge last Friday. Based on their inspection, we will be closing the bridge today. They have discovered some structural issues that need to be taken care of. Jean Thibodeaux, our town engineer, has already begun his inspection process. He will give a report to the Mayor regarding the plan for repairs. We will also be looking at the traffic flow in that area.

EndFragment

Featured Posts
Recent Posts
Archive
Search By Tags
bottom of page