Keller Street Bridge Closed

March 30, 2017

FYI RESIDENTS
We have been notified by DOTD that they inspected the Keller Street Bridge last Friday. Based on their inspection, we will be closing the bridge today. They have discovered some structural issues that need to be taken care of. Jean Thibodeaux, our town engineer, has already begun his inspection process. He will give a report to the Mayor regarding the plan for repairs. We will also be looking at the traffic flow in that area.

 

 

Please reload

Featured Posts

General Obligation Bond

November 6, 2019

1/10
Please reload

Recent Posts
Please reload

Archive