SEWER PROJECT UPDATE 3/28/18 CES will be on Cypress & Main Street today. EndFragment EndFragment EndFragment EndFragment EndFragment

Garage Sale Map

24th Annual Abita Springs Whole Town Garage Sale Saturday, March, 31st, 2018 7:00 A.M. - 3:00 P.M. Rain or Shine ​ Visit the official website for more information or to sign up!

6th St. & Hwy. 59

SEWER PROJECT UPDATE 3/27/18 CES will be on 6th & Hwy. 59 today and then Main Street and Magnolia to continue cleaning and CCTVing. EndFragment EndFragment EndFragment EndFragment EndFragment

6th & St. Mary

SEWER PROJECT UPDATE 3/26/18 CES will be on 6th and St. Mary EndFragment EndFragment EndFragment EndFragment EndFragment

Easter Bunny

Don’t forget to listen for the sirens of the Firetruck.....the Easter Bunny will begin his ride around 9 am. The Fire Department will ride around as long as the weather permits. The Easter Bunny will be at Town Hall for 1 pm for the Easter Egg Hunt! Many thanks to Mrs Sherry Firman, who is absolutely incredible, and our wonderful Fire Department that keeps this tradition continuing.

Engineering Projects Update- March 2018

Jean Thibodeaux Railroad Avenue - Contractor has ordered material and construction will start when the material arrives. Appears that construction will be in April/May. Recreational trails - Project permit application is being review by the US Army Corps of Engineers. We expect to receive the permit in March. We are currently following up with the Corps to get an update. Abita Meadows - Currently in Final Stage Review and the majority of final stage comments have been addressed. Drainage maintenance - Developed plan to improve known problem areas with short term maintenance or develop engineering plans for more complicated situations. Several items have progressed and we continue to wor

St. Mary & 7th

SEWER PROJECT UPDATE 3/20/18 CES will be starting on St Mary St and 6th cleaning... St Mary and 7th CCTVing. Also, on Saturday, April 7th they will be doing the same type of work on Indian Trial. EndFragment EndFragment EndFragment EndFragment EndFragment

St. Joseph & 7th

SEWER PROJECT UPDATE 3/19/18 CES will be cleaning and CCTVing St. Joseph and 7th EndFragment EndFragment EndFragment EndFragment EndFragment

St. Joseph & Surrounding Area

SEWER PROJECT UPDATE 3/16/18 CES will be working on St. Joseph and surround streets. EndFragment EndFragment EndFragment EndFragment EndFragment

Keller & 3rd St.

SEWER PROJECT UPDATE 3/15/18 CES still working on Keller & 3rd Street. EndFragment EndFragment EndFragment

Keller & 3rd St.

SEWER PROJECT UPDATE 3/14/18 CES working on Keller & 3rd Street. EndFragment EndFragment EndFragment

Debris Pickup Scheduled

Attn Residents: THERE IS A DEBRIS PICKUP SCHEDULED TUESDAY MARCH 27TH TO CLEAN UP TOWN BEFORE THE ALL TOWN GARAGE SALE. PLEASE BE SURE TO CALL LINDA 892-0711 WITH YOUR LOCATION TO BE PUT ON LIST.

Keller & 2nd St.

SEWER PROJECT UPDATE 3/14/18 CES working on Keller & 2nd Street. EndFragment EndFragment EndFragment

Keller & 2nd St.

SEWER PROJECT UPDATE 3/12/18 CES working on Keller & 2nd Street. EndFragment EndFragment EndFragment

Sewer Work

Keller Street between bridge and 3rd Street and possible road interruptions. EndFragment EndFragment EndFragment

Update- Level, Laurel & Keller

SEWER PROJECT UPDATE SEWER PROJECT UPDATE 3/8/18 StartFragment The Sewer project testing company will be starting on Level and Laurel St. Then they will move over to Keller St. They will be cleaning, CCTV and Dye Flood Testing. Dye testing with a non-toxic dye is used to confirm rain or ground entry points into the sanitary sewer system. Dyed water is introduced roof drain leaders, driveway drains, or area drains. In some instances, dyed water is injected into the ground around foundations to check for the illegal connections of foundation drains. EndFragment EndFragment EndFragment

Update- Keller St. & 7th St.

SEWER PROJECT UPDATE SEWER PROJECT UPDATE 3/7/18 Wednesday morning, today, cleaning and CCTV work will be starting on Keller & 7th Street going towards Hwy. 59. EndFragment EndFragment

Storm Debris & Understanding Green Waste

When cleaning storm debris you can put it in front your house to be picked up. Please don’t block ditches, culverts, mail boxes, fire hydrants, utility services or streets. Also, please keep drainage flowing by raking out and clearing any debris that is blocking your culverts or ditches. Understanding Green Waste: WHAT IS GREEN WASTE? Green waste is biodegradable waste composed of grass or flower cuttings, limbs and hedge trimmings, etc. Green waste piles are not to exceed 4’L x 4’W x 6’H in size and must be bundled. Nothing larger than 12” around Nothing over 50 lbs. Must be close enough to road for pickup with mechanical arm Do not place under low hanging limbs or power lines or any type o

ADVERTISEMENT FOR PUBLIC HEARING- March 28

ADVERTISE AS A PUBLIC HEARING The owners and developers of the property known as the Quail Farm Trace, on Hwy 435 will attend the meeting scheduled for March 28, 2018 to gain approval of a New Conceptual Plan which will be presented in order to move forward with the requested Re-Zoning of the property to a Planned Unit Development. The Planning & Zoning Commission will review this documentation in order to make the required recommendation to the Town Council. All interested parties are welcome to attend the meeting which will be held in the Abita Springs Conference Room at 6 pm. ADVERTISEMENT FOR A PUBLIC HEARING A Recommendation is required from the Planning & Zoning Commission, to amend th

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
Recent Posts
Search By Tags
Featured Posts
Archive
  • facebook-square

© Town of Abita Springs 2016.  Contact the Webmaster.

Many included photographs are © George H. Long.